After putting on two wall plates then it was
time to work on the rafter support in the middle of the building. Here the
carpenter works on on the fittings on the middle posts.
Here Carpenter measures for the size the boards are suppose to be to hold the main rafter support.
Now he measures a board to cut the right length...
...and cuts it to size.
Then a board is nailed on each side of the middle poles to create a fitting for the main rafter support...
...and they look like this when completed.
Meanwhile, Pastor Ema prepares maize for lunch.
Hot and yummy! Time for lunch.
.
Here Carpenter measures for the size the boards are suppose to be to hold the main rafter support.